The Pipeline’s Challenge: an aging pipeline was supposed to be empty during maintenance work. But crude oil was discovered in it, prompting a rapid response action from Baker to reduce the risk of a delay in the project, or worse, an oil spill at the refinery site.
The Baker Tank Solution: the quick design, delivery, and installation of 11 21,000 gallon steel tanks connected with over 300 feet of heavy-duty, flexible hose and manifolds. Subsequent oil pumping eliminated the risk of a spill, while the pipeline was made ready again for future use.