Double Slide Rail System
BakerCorp, formerly Cormier
Shoring was one of the first companies in the United States to
make the Slide Rail System available to contractors.

The Slide Rail System is ideal for projects previously only thought
possible with sheet pile or H-beam and lagging.
We proudly carry the new parallel slide rail system; the latest
advance in the slide rail design.
The conventional slide rail design has the cross braces mounted
to the face of the slide rail. The new "sliding frame"
on the parallel system is a complete cross brace "set"
that rolls on the face of the rail. This design allows the rails
to be pushed down independent of each other.
- The double slide rail is designed for depths of up to
24 feet.
- All of the slide rail systems utilize the same panels:
Base plates and extension plates.
- The base plates are equipped with a reinforced cutting
edge to ease installation.
- The 4' high extension plates are designed to be pinned
onto the base plates.
- Both base plates and extension plates are available in
lengths of
8.20, 9.84, 11.48, 13.12, 14.76, 16.4, and 20.5 feet.
Pit
Shoring System
Adaptable and effective, the Krings Corner slide
rail pit shoring system is the proven time and labor saving method
of shoring all types of pit excavations.
Available in single and double
corner slide rail configurations, the pit shoring system is
fully compatible with other Krings systems, and is able to overcome
the problems associated with crossing utility lines and services.
- Uses corner double slide rails of different
lengths and side wall plates to form fully shored pits up to 30
feet deep.
- This combination allows the contractor to sheet and dig
the pit with an excavator in about 1/3 the time of conventional methods with half the labor requirements and
no vibration to adjacent structures.
- Great for use in tank installations, controlled environment
vaults, micro-tunneling pits and retaining walls, access pits,
manhole shafts, boring pits, utility vaults, maintenance and repair
shafts, package pump stations and other precast structures.

Triple
slide Rail System
Designed for excavations of up to thirty feet deep;
the system requires less labor, less equipment, and less time
to install and remove, providing the safety conscious contractor
with peace of mind.
Up to 13.5 feet of clearance is possible because of the position
of the lower brace and strength of the system. Cast in place culvert
and monolithic pour-in-place sewer systems are possible with this
system. The inner walls are frequently used as the outside form.
- The design of the system allows digging in stages so that
soil pressures are broken down into three walls for ease of installation
and removal.
- The position of the top brace can be changed to accomodate
the needs of digging equipment.
- Because the system is pushed into the ground as the digging
process continues, the trench side-walls are always supported.
Obstructions can be removed as you dig without exposure of your
employees to hazardous ground movement.
|