Trench Shoring


slide Rail Systems


Double Slide Rail System
BakerCorp, formerly Cormier Shoring was one of the first companies in the United States to make the Slide Rail System available to contractors.



The Slide Rail System is ideal for projects previously only thought possible with sheet pile or H-beam and lagging.
We proudly carry the new parallel slide rail system; the latest advance in the slide rail design.
The conventional slide rail design has the cross braces mounted to the face of the slide rail. The new "sliding frame" on the parallel system is a complete cross brace "set" that rolls on the face of the rail. This design allows the rails to be pushed down independent of each other.

  • The double slide rail is designed for depths of up to 24 feet.
  • All of the slide rail systems utilize the same panels: Base plates and extension plates.
  • The base plates are equipped with a reinforced cutting edge to ease installation.
  • The 4' high extension plates are designed to be pinned onto the base plates.
  • Both base plates and extension plates are available in lengths of
    8.20, 9.84, 11.48, 13.12, 14.76, 16.4, and 20.5 feet.


Pit Shoring System
Adaptable and effective, the Krings Corner slide rail pit shoring system is the proven time and labor saving method of shoring all types of pit excavations.

Available in single and double corner slide rail configurations, the pit shoring system is fully compatible with other Krings systems, and is able to overcome the problems associated with crossing utility lines and services.

  • Uses corner double slide rails of different lengths and side wall plates to form fully shored pits up to 30 feet deep.
  • This combination allows the contractor to sheet and dig the pit with an excavator in about 1/3 the time of conventional methods with half the labor requirements and no vibration to adjacent structures.
  • Great for use in tank installations, controlled environment vaults, micro-tunneling pits and retaining walls, access pits, manhole shafts, boring pits, utility vaults, maintenance and repair shafts, package pump stations and other precast structures.



Triple slide Rail System
Designed for excavations of up to thirty feet deep; the system requires less labor, less equipment, and less time to install and remove, providing the safety conscious contractor with peace of mind.

Up to 13.5 feet of clearance is possible because of the position of the lower brace and strength of the system. Cast in place culvert and monolithic pour-in-place sewer systems are possible with this system. The inner walls are frequently used as the outside form.

  • The design of the system allows digging in stages so that soil pressures are broken down into three walls for ease of installation and removal.
  • The position of the top brace can be changed to accomodate the needs of digging equipment.
  • Because the system is pushed into the ground as the digging process continues, the trench side-walls are always supported. Obstructions can be removed as you dig without exposure of your employees to hazardous ground movement.